230 kWp solar power plant, installed on the roof of the Silo building, car park with 425 parking spaces on 7 levels. It was commissioned in 2016. It is a first-generation power plant for total sale. It produces up to 320 MWh per year.              

A solar power plant that adds up to 211.5 kWp with the power plant installed on the roof of the Rubis building and the photovoltaic parking lot shades, a first for the group. Commissioned in 2011, it is a first generation power plant: for sale in full. It produces up to 265 MWh per year.

43.2 kWp solar power plant on the roof of the Quartz building. Commissioned in 2017, it is a second generation plant: self-consumption. It produces up to 55 MWh per year.

The solar power plants of these two buildings, the Prisme and the Robole, have a combined power of 94.6 kWp. Commissioned in 2010, these are first generation power plants: for sale in full. They produce up to 117 MWh per year.

70 kWp solar power plant, installed on the roof of the Patio building. Commissioned in 2013, it is a first generation photovoltaic power plant: for total sale. It produces up to 85 MWh per year.

99 kWp solar power plant, installed on the roof of the Panoramic building. Commissioned in 2013, it is a first generation photovoltaic power plant: for sale in full. It produces up to 123 MWh per year.

The Shed and Victory both have solar power plants... on the roof, i.e. a total power of 138 kWp. Commissioned in 2010 this are first-generation solar power plants: for sale in full. They produce up to 200 MWh per year.

98 kWp solar power plant, installed on the roof of the Crown building in Nice. Commissioned in 2016, it is a first generation photovoltaic power plant: for total sale. It produces up to 118 MWh per year.

The Arteparc Meyreuil brings together 6 buildings with a total power of 492 kWp. Commissioned from 2010, they are first generation photovoltaic power plants: for sale in full. They produce up to 615 MWh per year.   

Campus which should eventually include about 20 buildings. The rooftop power plants on the existing buildings will total up to 339 kWp. The first power plants will be commissioned in 2016. They are second-generation power plants: either totally self-consuming or with surplus. The Arteparc building power plants produce up to 291 MWh per year.