230 kWp solar power plant, installed on the roof of the Silo building, car park with 425 parking spaces on 7 levels. It was commissioned in 2016. It is a first-generation power plant for total sale. It produces up to 320 MWh per year.
Location
Avenue Simone Veil - 06000 NICE
Power
230 kWp
Producable
320 MWh
Photovoltaic power plant of Centrale immeuble le Rubis
A solar power plant that adds up to 211.5 kWp with the power plant installed on the roof of the Rubis building and the photovoltaic parking lot shades, a first for the group. Commissioned in 2011, it is a first generation power plant: for sale in full. It produces up to 265 MWh per year.
Location
Avenue Galilée - 13100 AIX EN PROVENCE
Power
211.5 kWp
Producable
265 MWh
Photovoltaic power plant of Centrale immeuble le Quartz
43.2 kWp solar power plant on the roof of the Quartz building. Commissioned in 2017, it is a second generation plant: self-consumption. It produces up to 55 MWh per year.
Location
Avenue Galilée - 13100 AIX EN PROVENCE
Power
43.2 kWp
Producable
55 MWh
Prisme & Robole photovoltaic power plant for building solar power plants
The solar power plants of these two buildings, the Prisme and the Robole, have a combined power of 94.6 kWp. Commissioned in 2010, these are first generation power plants: for sale in full. They produce up to 117 MWh per year.
Location
85 rue Pierre Duhem - 13100 AIX EN PROVENCE
Power
94.6 kWp
Producable
117 MWh
Photovoltaic power plant of Solar Power Plant building le Patio
70 kWp solar power plant, installed on the roof of the Patio building. Commissioned in 2013, it is a first generation photovoltaic power plant: for total sale. It produces up to 85 MWh per year.
Location
ZAC La Duranne - Avenue Galilée - 13100 AIX-EN-PROVENCE
Power
70 kWp
Producable
85 MWh
Photovoltaic power plant of Panoramic building power plant
99 kWp solar power plant, installed on the roof of the Panoramic building. Commissioned in 2013, it is a first generation photovoltaic power plant: for sale in full. It produces up to 123 MWh per year.
Location
360 rue de Broglie - 13100 AIX-EN-PROVENCE
Power
99 kWp
Producable
123 MWh
Shed & Victoire photovoltaic power plant
The Shed and Victory both have solar power plants...
on the roof, i.e. a total power of 138 kWp. Commissioned in 2010 this
are first-generation solar power plants: for sale in full.
They produce up to 200 MWh per year.
Location
LE CANET - route de la Cote d'azur - 13590 MEYREUIL
Power
138 kWp
Producable
200 MWh
Photovoltaic Power Plant of The Crown Building
98 kWp solar power plant, installed on the roof of the Crown building in Nice. Commissioned in 2016, it is a first generation photovoltaic power plant: for total sale. It produces up to 118 MWh per year.
Location
Avenue Simone Veil - 06000 NICE
Power
98 kWp
Producable
118 MWh
Arteparc Meyreuil photovoltaic power plant
The Arteparc Meyreuil brings together 6 buildings with a total power of 492 kWp. Commissioned from 2010, they are first generation photovoltaic power plants: for sale in full. They produce up to 615 MWh per year.
Location
LE CANET - route de la Cote d'azur - 13590 MEYREUIL
Power
492 kWp
Producable
615 MWh
Photovoltaic power plant of Arteparc power plants of Lille-Lesquin
Campus which should eventually include about 20 buildings. The rooftop power plants on the existing buildings will total up to 339 kWp. The first power plants will be commissioned in 2016. They are second-generation power plants: either totally self-consuming or with surplus. The Arteparc building power plants produce up to 291 MWh per year.
Location
97 Rue Marcel Sembat - 59810 LESQUIN
Power
339 kWp
Producable
291 MWh
Photovoltaic power plant of KPMG building power plant
66.6 kWp solar power plant, installed on the roof of the
KPMG building. Commissioned in 2012, it is a photovoltaic power plant of
first generation: on full sale. It produces up to 80 MWh per year.
Location
ZAC EUREKA - Mas de Pastourel - 34000 MONTPELLIER
Power
66.6 kWp
Producable
80 MWh
Photovoltaic power plant of Crossroad A&B building power plants
Campus of 2 certified buildings, with a combined photovoltaic power of 170 kWp. Both plants are commissioned in 2013 and are first generation photovoltaic power plants: for total sale. These two plants produce up to 185 MWh per year.
Location
55 rue Auguste Comte - 13100 AIX EN PROVENCE
Power
170 kWp
Producable
185 MWh
Photovoltaic power plant of Centrales campus St Hilaire
Campus of 3 buildings, cumulating a photovoltaic power of 213 kWp distributed on the three roofs. The photovoltaic power plants in buildings A and B, commissioned in 2015, are first generation plants: for sale in full. The rooftop power plant in Building C, commissioned in 2017, is a third-generation power plant. It is self-consuming for the building's general services and supplies an innovative cold storage system (GREENCORE). The three plants produce up to 259 MWh per year.
Location
595 rue Pierre Berthier - 13590 AIX-EN-PROVENCE
Power
213 kWp
Producable
259 MWh
Arteparc Bachasson Solar Power Plant Photovoltaic Power Plant
99.8 kWp solar power plant, installed on the roof of building A of the Arteparc de Bachasson. Commissioned in 2013, it is a first generation photovoltaic power plant: for total sale. It produces up to 137 MWh per year.
Location
Lieu-dit Bachasson - Building A - 13590 MEYREUIL
Power
99.8 kWp
Producable
137 MWh
Photovoltaic power plant of Apollo building solar power plant
250 kWp solar power plant, installed on the roofs of the APOLLO A and APOLLO B buildings. Commissioned in July 2013, it is a first generation photovoltaic power plant: for sale in full. It produces up to 303 MWh per year.
Location
ZAC EUREKA - 6 rue Pommesargues - 34000 MONTPELLIER
Power
250 kWp
Producable
303 MWh
Savoyeux Hydroelectric Power Plant
Located in the heart of a former paper mill closed in 1975, the Savoyeux power plant was acquired in 2015 by the ARTEA Group. In 2017, two Kaplan Double Adjustment direct-drive turbines were installed in the power plant, along with the replacement of all the production equipment.
Location
Savoyeux (70)
River
The Saône
Type of plant
Low fall
Power
400 kW
Producable
2,160 MWh/year
Sauvat Hydropower Plant
The Sauvat power station was the first high-head project of the ARTEA Group. It is also fully in line with ARTEA's strategy of supplying energy with electricity without a purchase obligation. The power station has been renovated with a second 400 kW turbine to increase the power.
Location
Sauvat (15)
River
Le Mardaret
Type of plant
High fall
Power
1,480 kW
Producable
3,180 MWh/year
Samoëns Hydropower Plant
Acquired in May 2015, the plant
of Samoëns has been renovated with an increase in power. It is part of
ARTEA's strategy of supplying energy with electricity outside of the
purchase obligation.
The building originally housing
a 640 kW turbine was expanded to accommodate a second 400 kW turbine.
kW under purchase obligation.
The water intake and
electrical installations have been completely renovated.
Location
Samoëns (74)
River
Nant d'Ant
Type of plant
High fall
Power
1040 kW
Producable
3,000 MWh/year
Hydroelectric power plant of Centrale des Planches
Nestled in the heart of the listed site of the Gorges de la Langouette, the
The Planches-en-Montagne generating station was built in the 1960s at the
of an old sawmill.
The first draft of the ARTEA Group's average fall, the take
water, electrical installations and production facilities have
fully rehabilitated in 2017.
Location
Les Planches en Montagne (39)
River
The Healthy
Type of plant
Average drop
Power
600 kW
Producable
2,570 MWh/year
Perrigny hydroelectric power plant
Acquired in 2015, the Perrigny power plant is the second hydraulic project of the ARTEA Group. It relaunches the group's growth phase in hydroelectricity. Renovated in 2010 as part of the purchase obligation contracts, ARTEA chose to renovate the site's automation in order to improve the power plant's performance.
Location
Perrigny sur l'Ognon (70)
River
The Onion
Type of plant
Low fall
Power
320 kW
Producable
1,200 MWh/year
Moulin du Pont hydroelectric power plant
The Moulin du Pont power station was completely rebuilt with the installation of a new Kaplan turbine. The site, abandoned for many years, has been redesigned for better performance and easier operation. A fish pass, planned on the left bank, will complete the equipment in the summer of 2020.
Location
Genis (24)
River
Auvézère
Type of plant
Low fall
Power
250 kW
Producable
730MWh/year
Marvit Hydroelectric Power Plant
Neighbouring the Moulin du Pont power station, the Marvit power station has undergone a complete overhaul of its production facilities coupled with major ecological compliance work on a threshold of over 5 metres.
Location
Genis (24)
River
Auvézère
Type of plant
Low fall
Power
400 kW
Producable
1,390 MWh/year
Duellas Hydroelectric Power Plant
Installed at the diversion canal of the old lock at Duellas Falls, the power station is the first hydraulic project of the ARTEA Group, acquired in 2011. It was renovated between 20012 and 2013. As part of its acquisition, the automation system was renovated to improve the power plant's performance.
Location
Saint Martial d'Artenset (24)
River
Isle
Type of plant
Low fall
Power
320 kW
Producable
1,095 MWh/year
Colombier Hydroelectric Power Plant
Initially resulting from the transformation of the former Moulin Rayot into a spinning mill, the Colombier-Fontaine power station is installed on a former industrial complex. In 2016, ARTEA teams renovated the power station by modifying the water intake, installing a fourth unit and modernising all the electrical installations and automation on the site.